000 | 00811nam a2200229u 4500 | ||
---|---|---|---|
001 | 01029762 | ||
003 | PWmBRO | ||
008 | 930922s1993 enk 000010 eng | ||
010 | _a93016376 | ||
020 | 0 | 0 | _a0860173674 |
090 | 0 | 0 |
_aVF _b693.5/A895p |
100 | 1 | 0 | _aAubrey, D. W. |
245 | 1 | 0 |
_aPerformance of sealant-concrete joints in wet conditions : _bresults of a laboratory testing programme research project RP355: phase 2, stage 3 volume 2: schedules of detailed test results / _cD.W. Aubrey. |
260 | 0 |
_aLondon : _bCIRIA, _c1993. |
|
300 | _a48 p. | ||
440 | 0 |
_aCIRIA project report ; _v8 |
|
650 | 0 |
_aConcrete construction _xJoints. |
|
650 | 0 | _aJoints (Engineering) | |
710 | 2 | 0 | _aConstruction Industry Research and Information Association (Great Britain). |
942 | _2ddc | ||
994 | 0 | 1 | _a089260 |
999 |
_c68815 _d68815 |