000 | 01004nam a2200265u 4500 | ||
---|---|---|---|
001 | 00827525 | ||
003 | PWmBRO | ||
005 | 20180324042757.0 | ||
008 | 880921s1987 dcu b i00010 eng | ||
010 | _a 55051592 | ||
020 | _a0801835895 (pbk.) | ||
050 | 0 |
_aTL151.5 _b.T48 1987 |
|
090 | 0 | _a388.31/44/T368v | |
100 | 0 | 0 | _aThawat Watanatada. |
245 | 1 | 0 |
_aVehicle speeds and operating costs : _bmodels for road planning and management / _cby Thawat Watanatada, Ashok M. Dhareshwar, Paulo Roberto S. Rezende Lima ; in collaboration with Patrick M. O'Keefe, Per E. Fossberg. |
260 | 0 |
_aWashington, D.C. : _bWorld Bank, _c1987. |
|
300 | _ax, 460 p. | ||
440 | 4 | _aThe Highway design and maintenance standards series | |
650 | 0 |
_aMotor vehicles _xCost of operation _xMathematical models. |
|
650 | 0 |
_aMotor vehicles _xSpeed _xMathematical models. |
|
700 | 1 | 0 |
_aDhareshwar, Ashok M., _d1949- |
700 | 1 | 0 |
_aLima, Paulo Roberto S. Rezende, _d1944- |
942 | _2ddc | ||
994 | 0 | 1 | _aT1001 066 220 |
999 |
_c52169 _d52169 |