Delays and disruptions in construction : ascertaining the cost : a case study in assessing a contractor's claim / by P.E. Goodacre and A.A. Hunter.
By: Goodacre, Peter E.
Contributor(s): Hunter, A.A | Chartered Institute of Building (Great Britain).
Material type:![materialTypeLabel](/opac-tmpl/lib/famfamfam/BK.png)
Item type | Current location | Home library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|---|
Matheson Library | Matheson Library | Vertical Files | 692.8 G646d 1990 (Browse shelf) | Available | 083950 |
Browsing Matheson Library Shelves , Collection code: Vertical Files Close shelf browser
No cover image available |
![]() |
No cover image available |
![]() |
![]() |
No cover image available | No cover image available | ||
692.8 C636 A client's guide to cost-reimbursable contracts in building. | 692.8 F834b Building sub-contactor's claims - avoidance or submission? / | 692.8 G646 Delays and disruptions in construction : | 692.8 G646d 1990 Delays and disruptions in construction : | 692.80941 A899e 1988 Extensions of time / | 692.80941 J74 Standard form of building contract with contractor's design | 692.80941 J74 Standard form of building contract with contractor's design |
There are no comments for this item.